summaryrefslogtreecommitdiff
path: root/docs
diff options
context:
space:
mode:
authorNick Brassel <nick@tzarc.org>2023-03-03 14:16:06 +1100
committerGitHub <noreply@github.com>2023-03-03 14:16:06 +1100
commit7ebb8c2dece8ad78f92d15898813a7d9b480caf7 (patch)
treea92f4239575476f9617805953393a2550eed60d1 /docs
parent6fabc330e3bd8156e84ef3106c07e93d210c37d1 (diff)
Update branch names to reflect configurator's new deployment. (#19999)
Diffstat (limited to 'docs')
-rw-r--r--docs/breaking_changes.md8
-rw-r--r--docs/chibios_upgrade_instructions.md17
2 files changed, 19 insertions, 6 deletions
diff --git a/docs/breaking_changes.md b/docs/breaking_changes.md
index 6e0856d462..919c443123 100644
--- a/docs/breaking_changes.md
+++ b/docs/breaking_changes.md
@@ -34,7 +34,7 @@ The next Breaking Change is scheduled for May 28, 2023.
## What changes will be included?
-To see a list of breaking changes merge candidates you can look at the [`core` label](https://github.com/qmk/qmk_firmware/pulls?q=is%3Aopen+label%3Acore+is%3Apr). This label is applied whenever a PR is raised or changed, but only if the PR includes changes to core areas of QMK Firmware. A PR with that label applied is not guaranteed to be merged in the current cycle. New changes might be added between now and when `develop` is closed, and it is generally the responsibility of the submitter to handle conflicts. There is also another label used by QMK Collaborators -- `breaking_change_YYYYqN` -- which signifies to maintainers that it is a strong candidate for inclusion, and should be prioritised for review.
+To see a list of breaking changes merge candidates you can look at the [`core` label](https://github.com/qmk/qmk_firmware/pulls?q=is%3Aopen+label%3Acore+is%3Apr). This label is applied whenever a PR is raised or changed, but only if the PR includes changes to core areas of QMK Firmware. A PR with that label applied is not guaranteed to be merged in the current cycle. New changes might be added between now and when `develop` is closed, and it is generally the responsibility of the submitter to handle conflicts. There is also another label used by QMK Collaborators -- `breaking_change_YYYYqN` -- which signifies to maintainers that it is a strong candidate for inclusion, and should be prioritized for review.
If you want your breaking change to be included in this round you need to create a PR and have it accepted by QMK Collaborators before `develop` closes. After `develop` closes, new submissions will be deferred to the next breaking changes cycle.
@@ -127,12 +127,12 @@ This happens immediately after the previous `develop` branch is merged to `maste
* Validate each submodule SHA1 matches the qmk fork, e.g. for ChibiOS:
* Go to [qmk/ChibiOS](https://github.com/qmk/ChibiOS)
* Compare the commit hash in the above output to the commit hash in the repository
- * If there's a mismatch, that repository needs to have its `master` branch updated to match (otherwise Configurator won't work):
+ * If there's a mismatch, that repository needs to have its `qmk-master` branch updated to match (otherwise Configurator won't work):
* `cd lib/chibios`
* `git fetch --all`
- * `git checkout master`
+ * `git checkout qmk-master`
* `git reset --hard <commit hash>`
- * `git push origin master --force-with-lease`
+ * `git push origin qmk-master --force-with-lease`
* Announce that both `master` and `develop` are now unlocked -- message `@Breaking Changes Updates` on `#qmk_firmware` in Discord:
* `@Breaking Changes Updates -- Hey folks, develop has now been merged into master -- newest batch of changes are now available for everyone to use!`
diff --git a/docs/chibios_upgrade_instructions.md b/docs/chibios_upgrade_instructions.md
index 14afe2c743..62f16d0d25 100644
--- a/docs/chibios_upgrade_instructions.md
+++ b/docs/chibios_upgrade_instructions.md
@@ -4,7 +4,7 @@ ChibiOS and ChibiOS-Contrib need to be updated in tandem -- the latter has a bra
## Getting ChibiOS
-* `svn` Initialisation:
+* `svn` Initialization:
* Only needed to be done once
* You might need to separately install `git-svn` package in your OS's package manager
* `git svn init --stdlayout --prefix='svn/' http://svn.osdn.net/svnroot/chibios/`
@@ -21,7 +21,7 @@ ChibiOS and ChibiOS-Contrib need to be updated in tandem -- the latter has a bra
## Getting ChibiOS-Contrib
-* `git` Initialisation:
+* `git` Initialization:
* `git clone git@github.com:qmk/ChibiOS-Contrib`
* `git remote add upstream https://github.com/ChibiOS/ChibiOS-Contrib`
* `git checkout -b chibios-20.3.x upstream/chibios-20.3.x`
@@ -57,3 +57,16 @@ ChibiOS and ChibiOS-Contrib need to be updated in tandem -- the latter has a bra
* `git commit -am 'Update ChibiOS to 99.9.9'`
* `git push --set-upstream origin chibios-version-bump`
* Make a PR to qmk_firmware with the new branch
+
+## When merging a PR containing an upgrade of ChibiOS/ChibiOS-Contrib:
+
+* Update the target branch if the merge target was `master`:
+ * `git checkout qmk-master`
+ * `git reset --hard develop_YYYY_qN`
+ * `git push origin qmk-master --force-with-lease`
+* Update the target branch if the merge target was `develop`:
+ * `git checkout qmk-develop`
+ * `git reset --hard develop_YYYY_qN`
+ * `git push origin qmk-develop --force-with-lease`
+
+Note that when merging `develop` to `master`, the first workflow should still be followed.